- Steel Structure Works
Pertamina-Medco E&P Tomori Sulawesi
EPC contractor: Tripatra Samsung Consortium
This Project is located on Senoro, Luwuk Regency, Central Sulawesi. Owner of this project is Joint Operating Body Pertamina – Medco E&P Tomori Sulawesi. Mucoindo involved in this project as Steel Structure Installation and Flange Management Contractors. The project has been started in late 2013 and ended in mid 2015.
- Manpower:220
- Steel Structure Works
British Petroleum
EPC contractor: CSTS (Chiyoda, Saipem, Tripatra, SAE)
This Project is located on Tangguh, West Papua. Owner of this project is BP. Mucoindo involved in this project as Steel Structure Installation Contractors. The project has been started in late 2018 and still on going.
Tonnage: 11,000 tonnes Man Power: 500 men power
- Manpower:1.000
- Steel Structure Works
Awak Mas Gold Mine Project
EPC Contractor: PT Petrosea
The project is owned by PT Masmindo Dwi Area. Mucoindo participated as the contractor for the supply and fabrication of steel structures for the NonProcess Plant. Fabrication commenced in August 2025 and was successfully completed in December 2026.
- Piping Works
Exxon-Mobil Cepu Limited (EMCL)
EPC contractor: Tripatra Samsung Consortium
This Project is located on Bojonegoro, East Java. Owner of this project is Exxon-Mobil Cepu Limited. Mucoindo involved in this project as Piping and Turn Around Contractor. The project has been started on 2015 and finished on 2016.
- Dia inch 3.000
- Manpower:400
- Civil Works
Hutama karya infrastructure
This Project is located on Medan, North Sumatra. This toll road is part of Medan-Binjai Toll Road on Helvetia Section. Owner of this project is Hutama Karya Infrastucture. Mucoindo involved in this project as Civil Contractor. The project has been started on 2017 and finished on 2018.
- Manpower:60
- Civil Works
Perusahaan Listrik Negara
EPC contractor: Tripatra
This Project is located on Nias Island, North Sumatra. Owner of this project is Perusahaan Listrik Negara. Mucoindo involved in this project as Civil Contractor. The project has been started on 2018 and finished on 2019.
- Manpower:200
- Civil Works
Emily
EPC contractor: Tripatra Samsung Consortium
This Project is located on Balikpapan, East Kalimantan. Mucoindo involved in this project as Civil Contractor. The project has been started on 2019 and finished on 2020.
- Manpower:100
- EPC Works
PT Freeport Indonesia
EPC Contractor: Chiyoda
Located in JIPEE Gresik, Mucoindo delivered full EPC and project management for 20 buildings— including 6 substations and 14 service buildings— under the Manyar Smelter Project.
- EPC & PMT for20 buildings
- EPC Works
PT South Pacific Viscose (Lenzing Group)
EPCM : Tripatra Engineers And Constructors
This project, located at South Pacific Viscose (SPV), involved Mucoindo as the contractor for the CAP2 Building, a five-storey structure. The project had an 8- month duration and was completed in November 2022.
- EPC for CAP1 building
- EPC Works
PT South Pacific Viscose (Lenzing Group)
EPCM: IKPT
This project, located at South Pacific Viscose (SPV), involved Mucoindo as the contractor for the QIP Building, a five-storey structure. The project had a 9-month duration and was completed in October 2023.
- EPC & QIP1 building
- EPC Works
PT Pupuk Kaltim (PKT)
PT Kaltim Industrial Estate
Located at PT Kaltim Industrial Estate (subsidiary of PT Pupuk Kaltim), Mucoindo is executing EPC construction of the Soda Ash Plant Warehouse and supporting infrastructure, including storage facilities, a control room, laboratory, and substation, over a 24-month period starting in 2026.
- Maintenance
Pertamina-Medco E&P Tomori Sulawesi
Located in Senoro, Central Sulawesi, and owned by the Joint Operating Body Pertamina–Medco E&P Tomori Sulawesi, Mucoindo serves as the contractor for construction, installation, and fabrication, as well as the main contractor for the Turnaround 2024, running from December 2022 to 2025.
- Contract Period:36 Months
- Maintenance
Pertamina EP Asset 4
This project, located at Donggi Matindok Field, Central Sulawesi, involved the maintenance of approximately 30 km of trunkline. Owned by Pertamina EP Asset 4, Mucoindo served as the civil contractor. The project commenced in 2021 and was completed in 2024.
- Maintenance Area::30 KM of trunk line
- Maintenance
PT Vale Indonesia Tbk
This project in Sorowako, South Sulawesi, showcases Mucoindo’s expertise in providing On-Call Construction and National Asset Integrity Maintenance.
Since its start in 2024, we have been dedicated to delivering high-standard repair and maintenance solutions to sustain critical infrastructure.
- Manpower Supply
Pertamina EP
Owned by Pertamina EP, Mucoindo provides workforce services across Sangatta Fields I, II, and III, supporting operational, production, and auxiliary activities
- Contract Period::24 months, started on January 2023.
- Manpower Supply
PetroChina International
Owned by PetroChina International Jabung Ltd., Mucoindo provides manpower for operations, HEO transport, and production activities.
- Contract Period::24 months, started on August 2020.
- Manpower Supply
BP Tangguh Project
Owned by CSTS for the BP Tangguh project, Mucoindo provides skilled manpower, including welders, fitters, erectors, and painters, for construction works.
- Contract Period::24 months, started on January 2019.